Corporate workplace interior with structured ceilings and integrated technology infrastructure

01 / Environment · Corporate

Buildings that run the way operations want.

Building management, security, network and audio visual infrastructure for offices, towers and corporate workplaces across the UAE.

02 / One workplace, one system

BMS, building automation, fire infrastructure and access tied into one head-end. Enterprise-grade networking and unified Wi-Fi across every floor. Turnkey delivery for a full tower — or a single floor.

Corporate buyers evaluate the same short list: reliability, network performance, access management, scalability, documented change control, supportability and business continuity. We design and document to those criteria — one coordinated technology environment rather than a collection of separate systems.

One head-end, so BMS, fire and access appear on the same operator screen. Switching with segmentation, capacity headroom and accurate as-built drawings. And a clean handover: drawings, manuals, orientation and a support arrangement that continues after week two.

03 / The workplace stack

Six layers. One infrastructure.

  1. 01 /

    Physical infrastructure

    Containment, structured cabling, fibre backbone, risers and the equipment rooms everything terminates in.

    • Racks
    • Power
    • Cooling
  2. 02 /

    Network layer

    Switching, routing and segmentation sized with capacity headroom rather than to the opening device count.

    • Core
    • Access
    • VLANs
  3. 03 /

    Wireless layer

    Access-point density and placement designed against how the floors are actually occupied.

    • Coverage
    • Roaming
    • Guest
  4. 04 /

    Security and access

    Cameras, recording, readers and door hardware interfaces running over the same infrastructure.

    • CCTV
    • Access
    • Recording
  5. 05 /

    Building systems

    BMS and automation head-ends, with life-safety infrastructure and interfaces coordinated to a confirmed scope.

    • HVAC
    • Lighting
    • Interfaces
  6. 06 /

    Workplace experience

    Meeting-room AV, video walls, telephony, intercom and paging — the layer people actually touch.

    • AV
    • Telephony
    • Paging

Outcome /

One operating environment

Documented, segmented and supportable by the team that runs the building.

05 / The project team

Built around the project team.

Workplace projects rarely arrive from one direction. These are the roles we most often sit alongside, and what each of them needs the technology scope to do.

Owners, IT and facilities teams
Infrastructure you can actually run: documented networks with capacity headroom, segmentation you can reason about, access rights that can be changed without a site visit, and systems that scale as headcount and floor area change. Everything handed over with drawings, schedules and credentials.
Procurement teams
A clearly bounded technology scope with defined deliverables, interfaces and exclusions — so the package can be evaluated on what it includes rather than on what has been left ambiguous between trades.
Architects and workplace designers
Coordination on the things that show: ceiling and wall integration, meeting-room technology, display and speaker positions, access readers at entrances, and the equipment environments those systems need behind the scenes.
IT consultants
Structured cabling, wired and wireless architecture, rack and server-room layouts, and the dependencies between them documented against your design intent — including where our scope meets your equipment and applications.
MEP, ELV and technology consultants
Design coordination, scope definition, interface schedules and specification compliance, through testing, commissioning and the handover documentation set. Where you hold the design, we deliver to it and coordinate the interfaces with the other trades.
Fit-out contractors and builders
A defined specialist package that fits your programme — containment and first-fix in sequence, second-fix after finishes, commissioning windows agreed in advance, and one point of contact for the whole technology scope.
Main and prime contractors
Zentrum can be considered for appropriately defined ELV and integrated technology packages within larger contracted projects. We take responsibility for a bounded systems-integration scope, coordinate with the other packages, and deliver it with the testing, commissioning and documentation the wider contract requires.

When we come in /

  1. 01Early designInput on infrastructure, equipment environments and containment before the layout is fixed.
  2. 02Detailed designCoordination with the appointed IT, MEP or ELV consultant, and with the architect and fit-out team.
  3. 03Contractor selectionDiscussion of a bounded specialist technology package within a larger contracted project.
  4. 04Execution and fit-outDelivery sequenced against the construction or fit-out programme, including phased work in occupied buildings.
  5. 05Testing and commissioningSystem testing, integration checks and documented handover to the operations team.
  6. 06Existing systemsAssessment, upgrade or extension of infrastructure already in the building.

06 / Disciplines

The disciplines behind a workplace programme.

07 / Common questions

What corporate clients and project teams ask us.

At what stage should ELV and IT infrastructure be planned in an office fit-out?

As soon as the space plan is stable. Cabling routes, containment, rack and comms-room positions, power and cooling for equipment, and access-point and camera locations all depend on the layout — and all of them are cheap to place on a drawing and expensive to move once ceilings and partitions are closed. Waiting until fit-out is under way usually means compromised positions rather than impossible ones, but the compromises are permanent.

Can Zentrum coordinate with an appointed IT, MEP or ELV consultant?

Yes. Where a consultant holds the design, we deliver against their specification, work to their interface schedules, and provide the testing, commissioning and as-built documentation the design requires. Where no consultant is appointed, we can define the technology scope ourselves and set the same boundaries and documentation.

Can several technology disciplines be delivered as one coordinated scope?

That is the normal shape of our work. Cabling, networking, wireless, security, access, communication, audio visual and building systems share infrastructure and interfaces, so delivering them as one package removes the gaps that appear when each is procured separately — a single programme, one set of drawings, one commissioning sequence and one handover.

Can Zentrum work as a specialist package under a main contractor?

Yes. We work as a specialist technology and ELV integrator on appropriately defined subcontract packages, taking responsibility for the systems within that scope, coordinating with the other packages on site, and issuing the testing, commissioning and documentation required by the main contract.

Next step /

Bring us in early.

Planning a workplace, a fit-out or a full building — or looking for a specialist integrator for a defined ELV or systems package? Send us the scope and we will tell you how we would approach it.

For an occupied building, we also handle maintenance, remedial work and infrastructure upgrades.