Ordered network rack with labelled patching in a building equipment room

00 / How we work

Turnkey, in plain language.

One team designs it, installs it, programmes it, and supports it — so the thinking behind the system stays with the people who look after it.

01 / Delivery

Six stages, one accountable team.

  1. 01

    Discover

    Consultancy

    We meet on site. We walk every floor, every room, every plant area. We talk to the people who'll use the space and the people who'll maintain it. We listen first — requirements, site conditions, existing systems and constraints — before any technology is proposed.

    • 01Site walk with the architect, MEP consultant, owner and operator
    • 02Brief capture — outcomes first, technology second
    • 03Technical survey — power, pathways, equipment rooms, existing systems
  2. 02

    Design

    System Design · Product Supply

    Drawings, system schedules, points lists and an integration map. We select technology deliberately, justify each choice, and design a system architecture that can be operated for a decade — not just handed over on opening day.

    • 01Single-line diagrams, layouts and elevation schedules
    • 02Equipment schedules that name the actual systems selected, not anonymous boxes
    • 03Integration map across security, automation, fire and networking
  3. 03

    Coordinate

    Interfaces · Programme

    Technology touches almost every other package. Before anything is installed, the interfaces are agreed in writing: what belongs to us, what belongs to the MEP and fit-out trades, and what has to happen in which order for the programme to hold.

    • 01Interface schedule with the MEP, electrical and fit-out packages
    • 02Containment, power and equipment-room requirements confirmed
    • 03Delivery sequenced against the construction or fit-out programme
  4. 04

    Deploy

    Installation

    Cabling, installation, programming. We coordinate with the main contractor and MEP team, sequence the work to the build programme, install to the design rather than improvising in the field, and document as we go.

    • 01First-fix containment and cabling in sequence with the build
    • 02Second-fix devices after finishes, to the agreed positions
    • 03Labelled cabinets and ordered patching as the work progresses
  5. 05

    Commission

    Testing · Handover

    Systems are tested against the design, integrations are proven end to end, and the building is handed over with a documentation set the operating team can work from — not a folder nobody opens.

    • 01System-by-system testing and integration checks
    • 02As-built drawings, points lists and device schedules issued
    • 03Orientation and walkthrough with the operating team
  6. 06

    Support

    Maintenance

    Documented handover, orientation for the operating team, and maintenance, assessment or upgrade of the installed systems where agreed. The relationship after handover matters as much as the design.

    • 01Documented handover and orientation for the operating team
    • 02Maintenance, assessment and upgrade of the installed systems where agreed
    • 03Familiarity with the installed system when further work is agreed

02 / Interfaces

Where our scope meets everyone else's.

  1. 01 /

    Brief

    What the space has to do, who operates it and what the client expects to be able to change later.

  2. 02 /

    Design coordination

    Positions, containment, power and interfaces agreed with the architect, interior designer and MEP consultant.

    • Architect
    • Interior
    • MEP
  3. 03 /

    First fix

    Containment and cabling in sequence with the build, before finishes close the routes.

  4. 04 /

    Second fix

    Devices, panels and terminations after finishes, set out to the reflected ceiling and elevation drawings.

  5. 05 /

    Commissioning

    Testing, tuning and witnessed demonstration against the brief rather than against a product datasheet.

  6. 06 /

    Handover

    Training, as-built records and product documentation, so the next team inherits a system they can run.

Outcome /

A programme the main contractor can plan around.

The same sequence applies whether the package is one system or the full technology scope.

Conceptual delivery diagram: brief, design coordination with the architect, interior designer and MEP consultant, first fix, second fix, commissioning and a documented handover.

03 / One programme, two scales

Single villa, or full tower.

For Residences
From a single villa upwards. The same stages, scaled to a home — we work alongside the architect, interior designer and main contractor so the systems land cleanly in the finished space.
For Corporate
Up to a full commercial tower. BMS, fire infrastructure, access, networking and Wi-Fi delivered as one programme, coordinated with the MEP consultant, life-safety contractor and main contractor.
For Hotels & Resorts
Guest and back-of-house systems delivered together, sequenced around opening dates and phased handovers so operations can take the property on schedule.

Start here /

Start with a site walk.

Already have systems installed? Support after handover continues under maintenance and system assessment. For background on the team and the sectors we deliver in, see about Zentrum and project sectors.